Latest News
- Panasonic Jet Air Stream Installation Reduces Carbon Emissions in Scottish Surface Preparation and Coating Company 26/11/2025 eblast, part of eGroup, a large surface preparation and coating specialist company located in Kintor... Read more
- Panasonic Aquarea Heat Pump Delivers Year-Round Comfort and Efficiency for Home Retrofit in Cumbernauld 24/11/2025 A four-bedroom extended home in Cumbernauld, Scotland, has recently been transformed following the i... Read more
- Panasonic extends R32 ECOi-W heat pump range with new Inverter units 19/11/2025 Panasonic Heating & Cooling Solutions is delighted to introduce the latest addition to the ECOi-W ai... Read more
- Panasonic Introduces the New PACi NX Multi Zone Duct 18/11/2025 Panasonic Heating & Cooling Solutions is proud to announce the launch of its latest innovation: the ... Read more
- Panasonic’s Sleek FK1 Fan Coil Unit with nanoe™ X Enhances Residential and Commercial Spaces 12/11/2025 Panasonic Heating & Cooling has launched the FK1, its first water fan coil unit featuring cutting-ed... Read more
- Panasonic Provides Sustainable Refrigeration Solution for PRO Award Winning Aerospace Project 11/11/2025 An Aerospace company sought a solution for an aerospace project. Read more
- More Panasonic News
Panasonic Cools Data Centre in Belfast with Aircon
22/06/2018
Panasonic Cools Data Centre in Belfast with Aircon
One of the main challenges for data centres is coping with cooling and humidity control demands within the building because of the enormous heat gains generated by the large volume of computers and lighting systems – often in operation 24 hours a day, seven days a week. In the case of Concentrix Customer Engagement Centre in Belfast, there was also the added complication of the number of employees on site approaching close to 1500 people.
.jpg)
Belfast-based Aircon Sales and Service, which designs, supplies, installs and maintains various air conditioning solutions, recently installed a combination of Panasonic GHP VRF 3-pipe, 2-pipe and Split Hi Wall type units to heat and cool the 130,000 sq ft, three storey property at the Concentrix Call Centre in Belfast.
The installation at Concentrix was a very complex and challenging project due to the building’s design and lack of available electrical supply to the site. In addition to the nature of Concentrix’s business, which requires a significant power load for the operations of the building including lighting, computers and servers, the property also needed to provide comfortable conditions for the 1500 employees on site.
The team at Aircon’s contracts department, headed up by Manager, Stephen McGarry, worked closely with consultants Beattie Flannigan and mechanical contractors, Harvey Group, to deliver the best possible solution that site conditions would allow. Ian McFerran, Aircon’s Managing Director explains, “Quality underpins our entire delivery model, with professionalism and attention to detail being the primary focus. Coupled with competitive and cost-effective pricing, the overall package we deliver sets us apart from other market players.”
Due to the design of the building which features low ceiling heights on each floor, the team devised a solution based on a larger quantity of indoor units operating at lower capacities. Not only that, the Panasonic DX gas-fired system provides close to 1.2MW of cooling, using between 20kW and 25kW of electrical input, thus efficiently providing optimum cooling for the building whilst only drawing a minimal load from the buildings electrical power supply.
The equipment specified included the following:
• 13 Panasonic GHP gas heat pump 3-pipe outdoor units
• 5 Panasonic GHP 2-pipe VRF outdoor units to service AHU DX Systems
• 155 Panasonic VRF cassette indoor units to serve all call centre and meeting room areas
• 19 Panasonic Split Hi Wall systems to serve various small UPS and comms rooms
• Panasonic centralised and full Modbus BMS control
• Panasonic Air Off Control employed in all call centre area’s to provide a very high sensible heat ratio, 90%+
• All indoor units were sized to meet duties at medium to low fan speeds
This project benefits from a sophisticated solution offering high performance, is cost-effective, energy efficient and 100% reliable.
The team involved worked collectively to supply, design and deliver the perfect solution which saw a seamless installation and subsequent commissioning.